Skip to content
Efird Surveying Group, Inc. — We Measure Up To Your Expectations
Best of 2026 Award Winner — BusinessRate, Land Surveyor, DeLand FloridaBest of 2022 DeLand Award — Land Surveyor
Fax: 386-740-4155
475 South Blue Lake Avenue, DeLand, FL 32724

Flood Zone & Base Flood Elevation

Flood zone and Base Flood Elevation (BFE) work answers two questions that drive both permits and insurance: which FEMA flood zone applies to the structure, and what elevation the flood maps require it to meet. We identify the effective FIRM panel, zone, and BFE for the parcel, and field-verify the structure's elevations when the answer matters — before design, before permitting, or before an insurance requirement goes unquestioned.

Before you order the elevation certificate, the question is often simpler: is the building even in the flood zone, and what is the Base Flood Elevation? That answer drives the permit and the insurance.

When you may need this

  • A property is in or near a Special Flood Hazard Area
  • Designing or permitting construction that must meet a BFE requirement
  • An insurer or lender says the building is in a flood zone and you believe the structure sits above the mapped flood elevation
  • Coordinating an elevation certificate with new construction

What's included

  • Identification of the effective FIRM panel, flood zone, and published BFE
  • Field elevation work referenced to published flood data
  • Coordination with the elevation certificate or site plan

Not sure this is the survey you need?

If your insurance agent, lender, or building department has asked for 'the elevation certificate', order that — it is FEMA's standard form with surveyed elevations. Flood zone / BFE work answers the earlier, simpler question of which zone and what elevation apply in the first place. See Elevation Certificate →

Our process

  1. 1
    FIRM panel lookup

    We identify the current FEMA panel, effective date, flood zone, and BFE for the parcel.

  2. 2
    Field verification

    Where the question matters, we field-verify the structure's lowest adjacent grade and finished floor against the published BFE.

  3. 3
    Coordination

    Findings are coordinated with the design or permit team — site plan, elevation certificate, or LOMA effort if appropriate.

Related survey types

  • BFE coordination for new construction
  • Flood zone field verification
  • Field elevations supporting a Letter of Map Amendment (LOMA) request

Central Florida

Many Central Florida parcels straddle two zones — part X, part AE, part shaded X — and the difference shows up on both the permit and the insurance bill. We get the zone right before the project assumes it.

In the field

Owner, Edgewater

Parcel was partly in AE; field check confirmed the home itself was in X — supported a LOMA submission with the homeowner's insurance carrier.

Builder, Daytona Beach

Pre-design BFE confirmation drove the finished-floor elevation set for a new coastal build.

Engineer, DeLand

BFE and FIRM panel verification packaged with the topographic survey for a drainage design.

What you receive

Written confirmation of FIRM panel, flood zone, and Base Flood Elevation, with field elevations when the project needs them.

Why Choose Efird Surveying Group

Efird Surveying Group is a Central Florida land surveying firm based in DeLand, with more than 20,000 completed surveys across Volusia, Lake, Marion, Flagler, St. Johns, Putnam, Seminole, Brevard, and Orange Counties. Our field crews coordinate with homeowners, builders, lenders, engineers, and municipalities to deliver friendly, fast, reliable, and accurate work. Every drawing is produced in AutoCAD and can be delivered by email, PDF, or printed copy.

Every survey is delivered signed and sealed by a Florida licensed Professional Surveyor and Mapper (P.S.M.). Licensing & credentials →

Timing & scheduling

Current scheduling

We are currently booked out roughly 6–8 weeks before our crews reach many project sites, working with four field crews. This reflects our current workload and is not a permanent guarantee. Contact us for the most current scheduling on your specific project.

Expected project duration

Typical range: 2–4 weeks. Complex projects, changing floodplain requirements, missing documentation, or agency review may extend the timeframe.

What affects timing

Records research · Legal-description complexity · County or agency response times · Weather · Vegetation · Access restrictions · Property size · Terrain · Current workload · Number of available crews · Incomplete or revised supporting files · Project complexity · Unexpected field conditions

What determines your quote

Pricing varies substantially based on the project, property, requested survey type, legal and records research, parcel size, site access, vegetation, terrain, complexity, deadlines, required deliverables, and other project-specific conditions. The best way to receive accurate pricing is to request a project-specific written quote.

  • Survey type and required deliverables
  • Parcel size and shape
  • Site access and terrain
  • Vegetation and field conditions
  • Records and legal-description research
  • Deadlines and coordination
Request an Estimate

Frequently asked questions

What is a Base Flood Elevation?

The Base Flood Elevation (BFE) is the elevation that floodwaters are expected to reach during a base flood event, as published by FEMA for a given location.

Can this work remove a flood insurance requirement?

Sometimes. When field elevations show the structure sits at or above the Base Flood Elevation, that surveyed data can support a Letter of Map Amendment (LOMA) request to FEMA. The determination is FEMA's to make, but surveyed elevations are the evidence a request is built on.

Ready for your survey?

Contact us today for a free estimate. Call our DeLand office or send an estimate request and we'll get right back to you.