Final / As-Built Survey
A final or as-built survey documents what was actually built — the location of the structure, drainage features, utilities, and other improvements once construction is complete. Building departments use it to close out the permit, lenders and title companies use it to close on new construction, and engineers use it to certify site work. The drawing is signed and sealed by a Florida licensed P.S.M.
A final / as-built survey is the closing chapter of the construction file — it documents what was actually built, where, and at what elevation, in the format the lender, engineer, or building department needs to close out the project.
When you may need this
- Permit closeout and final inspection
- Lender or title company needs a final survey for closing on new construction
- Engineer needs a record of as-built conditions
What's included
- Field location of the completed improvements on the lot
- Drainage, paving, or utility as-built data when included in the scope
- Signed and sealed final / as-built survey drawing
Not sure this is the survey you need?
A boundary survey establishes where the legal lines are; a final / as-built documents where the completed improvements sit relative to those lines. The as-built is a closeout document — if the underlying line question is unresolved, boundary work comes first. See Boundary Survey →
On new construction in a flood zone the two are often ordered together: the as-built shows where everything was built, while the elevation certificate documents the structure's elevations on FEMA's form for insurance and permit closeout. See Elevation Certificate →
A site plan is the proposed-work drawing submitted to pull the permit; the final / as-built records the completed conditions the same permit is closed out against. New construction typically needs both — the site plan up front and the as-built at the end. See Site Plan →
Our process
- 1Site walk
Crew walks the completed site to confirm scope — house, driveway, drainage features, utilities, screen enclosure, pool deck.
- 2Field as-built measurement
Improvements are measured to the property lines, setbacks, easements, and to the elevation datum required by the project.
- 3Drainage and drainage features
Storm inlets, swale flowlines, retention areas, and pavement grades are included when the engineer or the city asks for them.
- 4Signed and sealed deliverable
Final as-built drawing is issued to the closing team, the engineer of record, and the building department.
Related survey types
- Final survey for closing
- As-built survey for permit closeout
- Drainage as-built
- Utility as-built
- House / site improvement as-built
Central Florida
Final as-builts are a routine closeout requirement in Volusia, Seminole, and Orange Counties, especially for new construction and commercial pad sites. We deliver the version each reviewer wants — homeowner-style for closings, engineering-style for permit closeout.
In the field
Final survey for the closing agent and lender included the house, driveway, pool, and screen enclosure as completed.
As-built included pavement, drainage, utilities, and rim/invert elevations for the engineer's certification package.
Drainage as-built for stormwater certification with cross-sections at requested intervals.
What you receive
Signed and sealed final / as-built survey, optional rim/invert tables and drainage cross-sections, and the AutoCAD source file for the engineer's certification package.
Why Choose Efird Surveying Group
Efird Surveying Group is a Central Florida land surveying firm based in DeLand, with more than 20,000 completed surveys across Volusia, Lake, Marion, Flagler, St. Johns, Putnam, Seminole, Brevard, and Orange Counties. Our field crews coordinate with homeowners, builders, lenders, engineers, and municipalities to deliver friendly, fast, reliable, and accurate work. Every drawing is produced in AutoCAD and can be delivered by email, PDF, or printed copy.
Every survey is delivered signed and sealed by a Florida licensed Professional Surveyor and Mapper (P.S.M.). Licensing & credentials →
Timing & scheduling
Current scheduling
We are currently booked out roughly 6–8 weeks before our crews reach many project sites, working with four field crews. This reflects our current workload and is not a permanent guarantee. Contact us for the most current scheduling on your specific project.
Expected project duration
The fastest expected completion is approximately 30 days after all required supporting construction files are received and reviewed. Required supporting files may include PDFs and DWG/CAD files. Construction sequence, revisions, site readiness, access, and contractor coordination may extend the schedule. We do not promise immediate completion.
What affects timing
Records research · Legal-description complexity · County or agency response times · Weather · Vegetation · Access restrictions · Property size · Terrain · Current workload · Number of available crews · Incomplete or revised supporting files · Project complexity · Unexpected field conditions
What determines your quote
Pricing varies substantially based on the project, property, requested survey type, legal and records research, parcel size, site access, vegetation, terrain, complexity, deadlines, required deliverables, and other project-specific conditions. The best way to receive accurate pricing is to request a project-specific written quote.
- Survey type and required deliverables
- Parcel size and shape
- Site access and terrain
- Vegetation and field conditions
- Records and legal-description research
- Deadlines and coordination
Frequently asked questions
What is the difference between a final survey and an as-built survey?
The terms overlap. A final survey usually refers to closeout for a closing on new construction, while an as-built survey documents the actual location of built features for engineering, permitting, or record purposes.
When should the final survey be ordered?
Once the improvements the reviewer needs to see are complete — typically the structure, driveway, drainage features, and any pool or screen enclosure — so the drawing reflects finished conditions. On new construction the closing date usually sets the schedule, so tell us the closing date when you order.
Related services
Foundation Survey
A foundation survey is performed after a foundation has been placed to verify the structure is located correctly on the lot, within setbacks, and consistent with the approved site plan.
Construction Layout & Staking
Construction layout — also called construction staking — converts the approved design into stakes, hubs, and marks in the field: the reference points the contractor actually builds to. Crews set building corners, offsets, grades, and utility and paving alignments from the engineer's plans, and return to re-stake as the work progresses.
Elevation Certificate
A FEMA Elevation Certificate documents the elevation of a structure relative to the Base Flood Elevation. Federally backed mortgage lenders require flood insurance for buildings in a Special Flood Hazard Area, and insurers use the certificate's surveyed elevations to rate the policy on the building's actual height rather than an estimate. The certificate is completed on FEMA's current form and signed and sealed by a Florida licensed Professional Surveyor and Mapper.
Ready for your survey?
Contact us today for a free estimate. Call our DeLand office or send an estimate request and we'll get right back to you.

