Foundation Survey
A foundation survey is performed after a foundation has been placed to verify the structure is located correctly on the lot, within setbacks, and consistent with the approved site plan.
A foundation survey is the moment-of-truth check after the slab is in — it confirms the building landed where the site plan said it would, before another dollar of vertical construction is spent.
When you may need this
- After foundation pour, before vertical construction continues
- When the building department requires foundation location verification
- When a lender or builder needs documentation of foundation placement
What's included
- Field location of the foundation relative to property lines and setbacks
- Signed and sealed foundation survey drawing
Our process
- 1Approved plans on hand
We pull the approved site plan and architectural footprint before mobilizing.
- 2Field measurement of the slab
All four corners of the foundation are measured to the property lines, setbacks, and easements.
- 3Comparison to plan
Field measurements are compared against the approved footprint; any deviation is flagged in writing.
- 4Signed deliverable
Signed and sealed foundation survey is delivered to the builder, lender, and building department.
Related survey types
- Slab foundation survey
- Stem wall foundation survey
- Multi-unit foundation survey
Central Florida
Central Florida builders working in Seminole, Orange, Volusia, and Brevard Counties typically need a foundation survey in the building department file before framing. We work directly with the on-site superintendent to schedule between pour and framing.
In the field
Foundation surveys for an entire phase scheduled the morning after pour, each lot delivered next business day.
Survey confirmed the slab was within 0.1' of the planned setback after a tight-lot pour.
Multi-pad commercial project — foundation surveys delivered as each pad poured.
What you receive
Signed and sealed foundation survey PDF, building-department-ready copies, and the AutoCAD file for the project record.
Why Choose Efird Surveying Group
Efird Surveying Group is a Central Florida land surveying firm based in DeLand, with more than 20,000 completed surveys across Volusia, Lake, Marion, Flagler, St. Johns, Putnam, Seminole, Brevard, and Orange Counties. Our field crews coordinate with homeowners, builders, lenders, engineers, and municipalities to deliver friendly, fast, reliable, and accurate work. Every drawing is produced in AutoCAD and can be delivered by email, PDF, or printed copy.
Every survey is delivered signed and sealed by a Florida licensed Professional Surveyor and Mapper (P.S.M.). Licensing & credentials →
Timing & scheduling
Current scheduling
We are currently booked out roughly 6–8 weeks before our crews reach many project sites, working with four field crews. This reflects our current workload and is not a permanent guarantee. Contact us for the most current scheduling on your specific project.
Expected project duration
The fastest expected completion is approximately 30 days after all required supporting construction files are received and reviewed. Required supporting files may include PDFs and DWG/CAD files. Construction sequence, revisions, site readiness, access, and contractor coordination may extend the schedule. We do not promise immediate completion.
What affects timing
Records research · Legal-description complexity · County or agency response times · Weather · Vegetation · Access restrictions · Property size · Terrain · Current workload · Number of available crews · Incomplete or revised supporting files · Project complexity · Unexpected field conditions
What determines your quote
Pricing varies substantially based on the project, property, requested survey type, legal and records research, parcel size, site access, vegetation, terrain, complexity, deadlines, required deliverables, and other project-specific conditions. The best way to receive accurate pricing is to request a project-specific written quote.
- Survey type and required deliverables
- Parcel size and shape
- Site access and terrain
- Vegetation and field conditions
- Records and legal-description research
- Deadlines and coordination
Frequently asked questions
When during construction is a foundation survey done?
After the foundation is in place and before vertical construction continues, so any issues with placement can be identified early.
Related services
Formboard Survey
A formboard survey is performed once the slab forms are set, before concrete is poured, so any issues with location or setbacks can be corrected without breaking concrete.
Construction Layout & Staking
Construction layout — also called construction staking — converts the approved design into stakes, hubs, and marks in the field: the reference points the contractor actually builds to. Crews set building corners, offsets, grades, and utility and paving alignments from the engineer's plans, and return to re-stake as the work progresses.
Final / As-Built Survey
A final or as-built survey documents what was actually built — the location of the structure, drainage features, utilities, and other improvements once construction is complete. Building departments use it to close out the permit, lenders and title companies use it to close on new construction, and engineers use it to certify site work. The drawing is signed and sealed by a Florida licensed P.S.M.
Ready for your survey?
Contact us today for a free estimate. Call our DeLand office or send an estimate request and we'll get right back to you.

